VPP Dashboard
Real-time fleet status and market position
Solar Generation
0kW
Peak production
Battery Capacity
0kWh
Aggregated fleet
Grid Power
0kW
Net position
VPP Export
0kW
Available capacity
Today's Revenue
$0
Estimated
Fleet Battery Status
0 units0%
Average State of Charge
Available: 0 kWh
Reserved: 0 kWh (customer backup)
Recent Events
Market Conditions
QLD1 Wholesale
Current Spot
$85.50
30min Forecast
$92.00
Price Cap
$16,600
FCAS Markets
Raise 6sec
$12.50
Lower 6sec
$8.20
Contingency
$45.00
Network (Ergon)
Constraint
None
DM Event
Inactive
Tariff Period
Peak
Dispatch Control
VPP operational mode and dispatch management
Operating Mode
⚠️ FNQ Operating Conditions
Cyclone season active (Nov-Apr). Ambient temperature: 32°C. Battery derating may apply above 35°C.
Ergon network export limits enforced per connection agreement.
Active Dispatches
| Dispatch ID | Type | Target | Duration | Status | Revenue | Actions |
|---|
DER Assets
Distributed Energy Resources in the VPP fleet
Connection Requirements (Energy Queensland)
All inverters must be AS/NZS 4777.2:2020 compliant. Export limits per Ergon connection agreement.
Remote disconnect capability required for VPP participation.
| Asset ID | Type | Site | Capacity | Output | SoC | Status | Actions |
|---|
Sites
Participating premises across Far North Queensland
| NMI | Location | Type | Solar | Battery | Export Limit | Status |
|---|
Participants
VPP program participants and value sharing
Participant Rights (AER Consumer Protections)
Participants retain control via minimum reserve settings. Opt-out available for any dispatch event.
Revenue sharing disclosed per ACCC requirements. Privacy protected under Australian Privacy Principles.
| Participant | Sites | Capacity | Min Reserve | YTD Earnings | Status |
|---|
Market Activity
Wholesale market participation and bidding
AEMO Market Participation
Operating as Demand Response Service Provider (DRSP) under NER Chapter 3.
Registered for Wholesale Demand Response Mechanism (WDRM). QLD1 region participant.
| Interval | Market | Bid MW | Price | Dispatched | Revenue | Status |
|---|
FCAS Services
Frequency Control Ancillary Services
FCAS Registration (AEMO)
Registered for Contingency Raise 6sec, Lower 6sec, and Regulation services.
Response verified via MASS (Market Ancillary Service Specification) compliance testing.
Raise Capacity
0MW
Lower Capacity
0MW
FCAS Revenue (MTD)
$0
FCAS Events
| Time | Service | Trigger | Response | Duration | Price | Revenue |
|---|
Revenue Analysis
Value streams and participant earnings
MTD Revenue
$0
YTD Revenue
$0
Participant Share
%
Revenue by Stream
Top Earners (MTD)
Regulatory Compliance
Australian energy market regulatory requirements
Regulatory Framework
National Electricity Rules (NER)
Registered as DRSP under Chapter 3. Compliant with Wholesale Demand Response mechanism.
AEMO Participant ID: TROPICGRID1.
Queensland Electricity Act 1994
Operating under retail exemption for VPP aggregation services.
Not classified as electricity retailer per QCA guidance.
Energy Queensland Standards
All sites compliant with Ergon Energy connection agreements.
AS/NZS 4777.2:2020 inverter compliance verified. Dynamic export limits enabled.
Consumer Protections
AER Consumer Data Right compliance. ACCC unfair contract terms reviewed.
Transparent value sharing and participant opt-out rights maintained.
Compliance Obligations
| Obligation | Authority | Frequency | Due Date | Status |
|---|
Event Log
Complete system event history (EDAM)
| Event ID | Type | Category | Entity | Details | Timestamp |
|---|
EDAM Business Rules
Automated decision engine configuration
Active Rules
| Rule ID | Name | Trigger | Executions | Success Rate |
|---|
Rule Execution History
| ID | Rule | Action | Result | Timestamp |
|---|